RADIARIS
Documentation›Start›Workflow in 7 steps

Workflow in 7 steps

The application is filled in from left to right. Steps 1 to 6 define the project; pressing Simulate system calculates everything and enables step 7.

Step What you define Documentation
1 · Project setup Installation and client type Project setup
2 · Site and roof Location, weather data, horizon, albedo; roof planes and objects that cast shade Site · Roof
3 · Consumption and tariff Client's consumption curve, special loads; electricity tariff Consumption · Tariff
4 · Design Equipment, placement, topology and final layout Equipment · Design
5 · Economics Costs, financial assumptions, loan, replacements Economics
6 · Advanced settings Calculation models, losses, electrical limits, uncertainty Advanced settings
7 · Scenarios and report Results, comparator, PDF report and offer Results

What is mandatory

To simulate you need at least a location and at least one roof plane. Everything else has reasonable default values for a typical home, so you can get a first result quickly and refine it later.

What happens when you simulate

  1. The weather year for the location is obtained (8,760 h).
  2. The consumption curve and the tariff are built.
  3. In automatic mode the installation is sized; in manual mode your topology is used.
  4. Each string is simulated hour by hour, aggregated at the inverter and balanced against consumption (and the battery, if there is one).
  5. The economics and the uncertainty are calculated and the report is prepared.

The details of each phase are in Calculation chain.

Iterate

Change whatever you need and press Simulate system again. To compare alternatives (with and without a battery, another orientation, another tariff) save each result as a scenario.

Is something missing or wrong? Write to us at hola@radiaris.com. Last reviewed: 26 October 2026.